Dupont UK Ltd
Thu, 16 Aug 2007
Kevlar Expansion Plant.
The project consisted of the expansion to the Kevlar Plant.
Steelwork and internal flooring totalling 750 te was installed over a 6 month construction period.
Restricted access and working conditions adjacent to the existing live plant, ensured a high level of safety and with aspects of construction.