Print this Page RSS

Alstom Power Ltd

Thu, 15 May 2008

Contract award of the Grain CHP Project at isle of Grain in Kent

Contract awarded for the detailing, supply, erection, cladding of various buildings & pipe racks totaling 4000te at Eon power station in Kent. 

Contract includes:-

3 Turbine Buildings

3 Feed Water Towers

3 HRSG Buildings

3 Electrical Buildings

3 Laydown Areas

3 Main Pipe Racks

1 CHP Pipe Rack

Plus various other structures.

Go Back